Friday, July 31, 2009

PREEMIE PUMPKIN HAT KNIT PATTERN

PREEMIE PUMPKIN HAT
KNIT PATTERN

Free pattern for charitable purposes and personal use only. 
Please do not sell garments knit from it. 
Pattern and photos are by Michele Lupien, 2012. 
All rights reserved. seatrailgrandmas@gmail.com

PREEMIE; XSmall (Small, Medium, Large)
Material:
Double pointed needles # 5 and # 10
4 ply RED HEART Soft Yarn Tangerine
3 ply LION BRAN Wool-Ease Sage
Cuff:
With N. #10; 
Cable cast on loosely: 30 (36, 42, 48) sts
Change for smaller needles
With N. #5;

Ribs K1, P1 for: ¾” ( ¾”,1”, 1”)
Hat:
Change for N.#10

Knit 4 sts (5, 6, 7) Purl 1st, around until your work measure 2.75” (3.5”,4”, 4.5”) from beginning.

Decreasing: 
*SSK: slip, slip, knit; Slip one stitch as you knit, slip one stitch as you knit, insert left needle into the front loops of the 2 slipped stitches and knit them together from this position.*
-XSmall:
.SSK, K2TOG, P1 around = 18 sts
.K2, P1 around = 18 sts
.K2tog, P1 = 12 sts
-Small:
.SSK, K1, K2TOG, P1 around = 24 sts
.K3, P1 around = 24 sts
.SSK, K2TOG around = 12 sts
-Medium:
.SSK, K2, K2TOG, P1 around = 30 sts
.K4, P1 around = 30 sts
.SSK, K2TOG, P1 around = 18 sts
.K2, P1 around = 18 sts
.K2TOG, P1 around = 12 sts
-Large:
.SSK, K3, K2TOG, P1 around = 36 sts
.K5, P1 around = 36 sts
.SSK, K1, K2TOG, P1 around = 24 sts
.K3, P1 around = 24 sts
.SSK, K2TOG, around = 12 sts
All sizes; you have now 12 sts
Change for smaller needles
With N. #5; Knit 1 (1, 2, 2) rounds
Stem
Using sage color
Knit 1 (1, 2, 3) rounds
Knit 2TOG around = 6 sts
Knit 2 (2, 2, 3) rounds
Knit 2TOG around = 3 sts
*Tip: knit the 3 sts on 1 needles* for be ready to knit a “I cord”
To see how to knit an I Cord video; copy and paste the address below on internet:
http://www.youtube.com/watch?v=iJ0s_2TBwCQ
I cord
Knit 4 rows
5th row, Knit the 3 sts together = 1 stitch
Finishing
Break yarn at 4” and pull yarn trough that stitch.
With a tapestry needle pull yarn in “I cord” middle.
Secure inside and eave ends. 5/13/13


No comments: